Kereta dari Massy TGV ke Geneva

🇫🇷 Massy TGV → 🇨🇭 Geneva

Jarak Garis Lurus

404 km

SE (132,3°)

Jarak Kereta Api

~525 km

Perkiraan via kereta api

Waktu Perjalanan

~2h 2m

High_Speed

CO2 yang Dihemat vs Penerbangan

91,3%

93,7 kg lebih sedikit CO2

Perbandingan Lingkungan

Kereta

High_Speed

Emisi CO2 8,9 kg

Penerbangan

Kelas ekonomi

Emisi CO2 102,6 kg

Naik kereta hemat 93,7 kg CO2 (91,3% lebih sedikit emisi)Naik kereta menghemat 93,7 kg CO2 (91,3% lebih sedikit emisi)

Informasi Rute

Memerlukan Transit

Stasiun di Rute Ini

Tips Perjalanan

SNCF TGV trains from Massy TGV, south of Paris, reach Geneva in around three hours tanpa passing through central Paris, menjadikan rute ini sebagain sangat baik pilihan for pelancong originating from the Île-de-France south.

Pemandangan Menarik

The Burgundy and Jura lanskap unfold as the TGV races south, with the Jura limestone punggungan-punggungan memberi jalan to the first Alpine kaki bukit near Bellegarde.

Tips Pemesanan

Pesan melalui SNCF Connect with maximum advance notice; Massy TGV tarif can be cheaper than Paris Gare de Lyon equivalents on the same trains.

Lanjutkan Perjalanan Anda

Pertanyaan yang Sering Diajukan

The estimated train journey from Massy TGV to Geneva takes approximately 2h 2m. This estimate is based on a rail distance of ~525 km using a high_speed service.
The estimated rail distance from Massy TGV to Geneva is approximately 525 km (404 km straight-line). Rail routes are longer than straight-line distances because tracks follow terrain and connect intermediate cities.
Travelling by train from Massy TGV to Geneva emits approximately 8,9 kg of CO2, compared to 102,6 kg by flight. Taking the train saves 93,7 kg of CO2 — a 91,3% reduction in emissions.
The route from Massy TGV to Geneva typically requires at least one transfer. Check operator timetables for the most direct connection available.
Check regional and national rail operator websites for services between Massy TGV and Geneva.

Train vs Flight comparison

Compare door-to-door time, CO2 and cost for Massy TGV to Geneva

Compare now →

Data terakhir diperbarui: 2026-02-27