Most Expensive Railway Lines to Build

Güzergah Sıralamaları

These railway lines required extraordinary capital investment due to challenging geography, urban tunneling, or advanced technology requirements. Costs per kilometer can reveal the engineering complexity involved.

# Ad Değer
1 Crossrail (Elizabeth Line) $870M/km (central tunnel)
2 East Side Access (LIRR) $750M/km
3 Gotthard Base Tunnel $210M/km
4 Channel Tunnel $190M/km (adj.)
5 California High-Speed Rail $185M/km
6 HS2 Phase 1 (London–Birmingham) $350M/km
7 Grand Paris Express $240M/km
8 Second Avenue Subway $2.5B/km (Phase 1)
9 Chuo Shinkansen (Maglev) $360M/km
10 Singapore–KL HSR (cancelled) $130M/km (est.)

Metodoloji

Ranked by inflation-adjusted construction cost per kilometer of completed route, based on official government audits and industry cost analyses.

Hızlı Bilgiler

Kategori Güzergah Sıralamaları
Girişler 10
Birim USD/km (millions)
Tüm sıralamalara geri dön