# الاسم القيمة
1 Crossrail (Elizabeth Line) $870M/km (central tunnel)
2 East Side Access (LIRR) $750M/km
3 Gotthard Base Tunnel $210M/km
4 Channel Tunnel $190M/km (adj.)
5 California High-Speed Rail $185M/km
6 HS2 Phase 1 (London–Birmingham) $350M/km
7 Grand Paris Express $240M/km
8 Second Avenue Subway $2.5B/km (Phase 1)
9 Chuo Shinkansen (Maglev) $360M/km
10 Singapore–KL HSR (cancelled) $130M/km (est.)